Energy infrastructure fund structuring, Asia Pacific
Problem
build investor facing structures and materials for storage and renewable infrastructure vehicles across Japan, Southeast Asia and Oceania.
Work
- produced bilingual fund proposals across several mandates and ticket sizes, designed partner structures, tranching and return targets, reconciled competing prospectus drafts, and conducted diligence on a prospective listing vehicle and a first investment target.
operating assumptions
Diligence pressure concentrated on operating assumptions rather than on the capital structure.
Consequence
the technical model was rebuilt to the same standard as the financial model before the materials went out.